Offers generous writing space for every day of the week
- Patented surface coating provides resistance to ghosting and staining.
- Suited for moderate use in spaces with regular traffic
- Magnetic surface. Hang your notes and more with magnets.
- Mounting hardware included.
- Backed by the manufacturer’s 20-year limited warranty.
- Includes 1 Quartet chisel tip dry erase marker.
| Item # | 192026 |
| Manufacturer # | CP32P2 |
| Color (Board) | White |
| Color (frame) | Graphite; White |
| width | 24 in. |
| height | 36 in. |
| magnetic | Yes |
| Marker Tray | Yes |
| board material | Steel |
| mounting hardware included | Yes |
| Recommended Board Use | Home; Meeting/Conference Room; Classroom; Office |
| Product Line | Prestige 2 Total Erase Magnetic Project Planner |
| quantity | 1 |
| brand name | Quartet |
| manufacturer | ACCO BRANDS USA, LLC |
| Total Quantity | 1 Dry-Erase Boards |
| assembly required | No |
| Date Format | Monthly |
| Mount Type | Wall |
| Package Type | Retail |
| Time Period | 1 |
| UPC | 034138201282 |




































Reviews
There are no reviews yet.