Stay focused and productive throughout the day while seated in a Techni Mobili Elegant Textured Boucle Polyester Mid-Back Executive Office Chair. The back, seat and armrests feature thick foam padding for all-day comfort and support. This adjustable office chair is equipped with seat height controls to help you quickly find your ideal working position.
- Recommended for performance use 6-8 hours per day.
- Weight capacity tested to support 225 lb.
- Polyester-upholstered office chair features a textured boucle finish for a sophisticated touch.
- Foam-padded back and seat offer lasting comfort.
- Sleek padded armrests.
- Supports quick seat height adjustments.
- Steel base is equipped with smooth-rolling nylon casters.
- Assembly required.
- Backed by the manufacturer’s 1-year limited warranty.
| Item # | 4448417 |
| Manufacturer # | RTA-3270C-WHT |
| Color (Seat) | White |
| width | 26-1/4 in. |
| height | 42-3/4 in. |
| depth | 26-1/2 in. |
| Weight Capacity (Seat) | 225 lb |
| Length (Seat) | 20-1/2 in. |
| Certifications | None |
| Color (frame) | Gold |
| Width (Seat) | 18 in. |
| Height (Maximum) – Floor To Seat | 29-1/2 in. |
| Height (Minimum) – Floor To Seat | 26 in. |
| chair back style | Mid-Back |
| furniture style | Modern |
| Material of Seat | Foam; Polyester |
| Adjustments | Seat Height |
| chair back material | Polyester |
| Ergonomic | No |
| Material of Frame | Steel |
| Reclines | No |
| recommended daily usage | Performance (6-8 Hours) |
| assembly | Assembly Required |
| Warranty | 1-Year Limited |
| Height Adjustment Type | Pneumatic/1-Touch |
| arm type | T-Arm |
| lumbar support | No |
| seat glide | No |
| Swivel | Yes |
| Waterfall Seat | Yes |
| rolling | Yes |
| Locking Casters | No |
| Collection | Techni Mobili |
| furniture use | Office Suites |
| quantity | 1 |
| arms | Yes |
| brand name | Techni Mobili |
| dimensions | 42-3/4 in. X 26-1/4 in. X 26-1/2 in. |
| Height Range (Floor To Seat) | 26 in. – 29-1/2 in. |
| manufacturer | RTA PRODUCTS,LLC |
| seat size | 20-1/2 in. X 18 in. |
| Total Quantity | 1 Executive Chairs |
| UPC | 815764018174 |





























Reviews
There are no reviews yet.